Increase mud density by hematite
Input(s)
\(W_{1}\): Initial Mud wt. (ppg)
\(W_{2}\): Required mud wt. (ppg)
Output(s)
B: Sacks of Hematite required per \(100 \mathrm{bbl}\) (stroke/100bbl)
Formula(s)
\[
B=1680 * \frac{W_{2}-W_{1}}{40-W_{2}}
\]
Reference(s)
Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 84.